PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling M7 Footing Facing North (800x600).jpg Footing and foundation wall layout at column line 6.5 (G-C.7) Facing South (800x600).jpg Installing metal decking at Derrick -2 Facing West (800x600).jpg UCFC Site May Picture Facing North-West (800x600).jpg Welding Derrick -1 3rd Floor Facing South (800x600).jpg Welding metal decking at Derrick -1 3rd Floor) Facing South-West (800x600).jpg Backfilled J7 Footing Facing North-West (800x600).jpg Backfilled M7 Footing Facing East (800x600).jpg Backfilling J7 Footing Facing North (800x600).jpg
Previous pageNext page Welding Derrick -1 3rd Floor Facing South (800x600)
Welding Derrick -1 3rd Floor Facing South (800x600)